in ,

Start of photovoltaic production 2019

From today (9.1.2019) 17 clock applicants can pick up the photovoltaic subsidy of the Federal Ministry of Sustainability and Tourism. The funding will be handled by the Green Electricity Processing Office (OeMAG).

As a first step, a so-called "ticket" must be obtained in order to enter the basic data. In the second step, the funding application must then be completed. The ranking of the funding applications takes place in the first week from January 09.01.2019th, XNUMX on the basis of the self-sufficiency share.

In addition to general information on the application, the homepage of the OeMAG (www.oem-ag.at/neues) also to find a guide to the application.

(Source: APA / OTS)

Photo by Andreas Gücklhorn on Unsplash

This post was created by the Option Community. Join in and post your message!

Written by Karin Bornett

Freelance journalist and blogger in the Community option. Technology-loving Labrador smoking with a passion for village idyll and a soft spot for urban culture.
www.karinbornett.at

Leave a Comment